|
|
| Home | About Us | News, Events, Weather | Downloads, Publications | Links | Employment, Volunteers | Search & Site Map | Planning, Permits, Maps |
|
|
| Water Management | Fanshawe, Pittock, Wildwood CAs | Landowner Grants, Stewardship | Watershed Health, Friends | Natural Areas, Plants, Animals | Education, Partnerships |
![]() |
2007 Upper Thames River Watershed Report Cards
Back to the 2007 Report Card homepage. |
1.6 ReferencesAgriculture Canada and Ontario Ministry of the Environment. Nutrient Management Studies. Aquafor Beach Ltd. 1995. The Thames Valley Areas Study: Recommended Subwatershed Plan. Prepared for City of London and Upper Thames River Conservation Authority. Aquafor Beach Ltd. 1995. Thames Valley Downstream Subwatershed Study. Aquafor Beach Ltd. 1999. Komoka Community Surface Water Plan. Prepared for the Municipality of Middlesex Centre. Aquafor Beach Ltd. 2002. Court Drain Subwatershed Study. Prepared for the City of Stratford. Bowles, Jane M. 2006. Recovery Strategy for Wood-poppy (Stylophorum diphyllum) in Canada [Proposed]. 24 pp. Copies may be downloaded from the SARA Public Registry - www.sararegistry.gc.ca City of London. 2006. Guideline Document for the Evaluation of Ecologically Significant Woodlands. Approved by Council June 26, 2006. City of London. March 1991. The Coves Hydrology Update Study. City of London. 1995. The City of London Subwatershed Studies Implementation Plan. City of London. 2007. Thames River Corridor Study, Phase I. City of London and Upper Thames River Conservation Authority. 1995. The Dingman Creek Subwatershed Study. City of London. 2005. The Dingman Creek Subwatershed Study Update. City of London. CLEAR Network. www.clear.london.ca City of Stratford Public Utilities Commission. 2004. The Groundwater Management Study for the City of Stratford. County of Oxford, 2006. Oxford Natural Heritage Study. www.county.oxford.on.ca City of Woodstock. 2007. East Woodstock Secondary Plan and Design Study. With Earth Tech, Paradigm and MHBC. Cumming Cockburn Ltd. 2000. Pottersburg Creek Storm Drainage and Channel Remediation Study, Municipal Class EA. Prepared for the City of London. Delcan. 1991. The Coves Hydrology Update Study. Prepared for the Upper Thames River Conservation Authority. Delcan. 2000. Pottersburg Creek Floodway Alternatives Study. Prepared for the City of London. Development Engineering London Ltd. 1999. Natural Heritage Strategy – Thamesford Area Secondary Plan. Development Engineering London Ltd. 2004. Conceptual Stormwater Management Plan for the Northwinds Woods Development. Development Engineering London Ltd. 2006. Stormwater Management Report, Timber Walk Subdivision Phase I, Ilderton, Ontario. Dillon Consulting and Golder Associates, 2004. The Middlesex-Elgin Groundwater Study. Unpublished. Dillon Consulting. 2004. The Coves Master Drainage Plan. Prepared for the City of London. Dillon Consulting. 2006. Ingersoll Stormwater Strategy. Prepared for the Town of Ingersoll and Upper Thames River Conservation Authority. Environment Canada. 2004. How Much Habitat is Enough? A Framework for Guiding Habitat Rehabilitation in Great Lakes Areas of Concern. Second Edition. www.on.ec.gc.ca/wildlife/publications-e.html Environment Canada / Canadian Wildlife Service. Great Lakes Factsheet. Forest Birds in Urban Areas: Habitat Needs of Area-Sensitive Species. Environment Canada / Canadian Wildlife Service. 2006. Area-Sensitive Forest Birds in Urban Areas. Friends of the Coves. 2004. The Coves Subwatershed Study. Federation of Ontario Naturalists / Ontario Nature. Woodland Facts. Gillingwater, Scott and UTRCA. 2004. Stewardship of the Spiny Softshell Turtle (Apalone spinifera spinifera). ISBN 1-894329-06-06. Published by the Upper Thames River Conservation Authority. Golder Associates. 2001. Phase II Groundwater Protection Study, County of Oxford. Prepared for the County of Oxford. Golder Associates. 2002. Groundwater
Resource Assessment: Huron County Groundwater Study. Ian Seddon Planning Services and Anthony Usher Planning Consultant. 2007. Komoka Provincial Park Preliminary Management Plan. Prepared for the Ontario Ministry of Natural Resources. Copies c/o Port Burwell Provincial Park. IBI Group. 2007. Status Review of Stoney Creek Subwatershed Study. Prepared for the City of London. Ingersoll. 2006. Ingersoll Stormwater Strategy. International Water Consultants Ltd. and International Water Supply Ltd. 2002. Town of St. Marys, Ontario, Perth County, Hydrogeologic Investigations 2001-2002. International Water Consultants Ltd. 2003. Town of St. Marys Wellhead Protection Area Computer Modelling Report. Marshall Macklin and Monaghan. 1995. Kelly-Stanton-Medway Subwatershed Studies. Marshall Macklin and Monaghan. 1995. The City of London Subwatershed Studies Implementation Plans. Prepared for the City of London and Upper Thames River Conservation Authority. McCormick Rankin Corporation. 2004. Kilworth Area Alternative Stormwater Management Strategies, Township of Middlesex Centre. Nurnberg, Gertrud and Bruce LaZert. 2006. Reservoir Water Quality Treatment Study, II: Water Quality Assessment and Modeling for the North Thames River watershed, including its major reservoirs and Pittock Lake on the Thames River. Prepared by Freshwater Research for Upper Thames River Conservation Authority and the Sierra Club of Canada. 61 pp. Paragon Engineering. 1995. Stoney Creek Subwatershed Study. Prepared for the City of London and Upper Thames River Conservation Authority. Paragon Engineering. 1995. The Pottersburg Creek and Crumlin Drain Subwatershed Study. Prepared for the City of London and Upper Thames River Conservation Authority. Stratford Roundtable on the Environment Committee. 2004. Roundtable on the Environment for the 21st Century Report, Charting Stratford’s Environmental Future. Prepared for the City of Stratford. Thames River Recovery Team, 2005. Recovery Strategy for the Thames River Aquatic Ecosystem: 2005-2010. November 2005 Draft. 146 pp. Upper Thames River Conservation Authority. 1984-1998. Kintore Creek Water Quality Studies. UTRCA. 1984. Stratford-Avon River Environmental Management Project. UTRCA. 1997. Dorchester Swamp Management Plan. UTRCA. 1998. The Cedar Creek Watershed Management Strategy. UTRCA. 1998. The Cedar Creek Watershed Enhancement Plan. UTRCA. 2001. Ecological Inventory for the TJ Dolan Natural Area. Prepared for the City of Stratford. UTRCA. 2003. The Middlesex Natural Heritage Study: A Natural Heritage Study to Identify Significant Woodland Patches in Middlesex County. www.thamesriver.on.ca/MNHS/MNHS.htm UTRCA. 2004. Dingman Creek Community-Based Watershed Strategy. Produced in partnership with the Friends of Dingman Creek and City of London. UTRCA. 2004. City of Stratford Natural Heritage Inventory. Prepared for the City of Stratford. UTRCA. 2004. Woodlands Study for Ingersoll. 6 pp. UTRCA. 2004. Ellice Swamp and Gads Hill Swamp, Conservation Management Guiding Document. Prepared in partnership with the Local Advisory Committee and Municipality of Perth East. UTRCA. 2005. Westminster Ponds / Pond Mills Management Plan Update. Prepared for the City of London with input from the Local Advisory Committee. UTRCA. 2007. Woodstock Natural Heritage Inventory. Prepared for the City of Woodstock. Waterloo Hydrogeologic, Inc. 2003. Perth County Groundwater Study Final Report. Project #302036. Prepared for Perth County, City of Stratford, Town of St. Marys, Ontario Ministry of the Environment. Websites:Drinking Water Source Protection – www.sourcewaterprotection.on.ca Lakewide Management Plans – www.great-lakes.net/lakes/ref/lamps.html |
Back to the 2007 Report Card homepage. |
|
This page was last
revised on
January 12, 2012.
Copyright © 2012 Upper Thames River Conservation Authority 1424 Clarke Road, London, Ontario, Canada N5V 5B9 tel: 519-451-2800 fax: 519-451-1188 All rights reserved. |